Sandoub, Daqahlia, Egypt
Design of Mechanical Biological Treatment Plant (MBT) in Sandoub, Daqahlia, Egypt for Solid Waste Recycling.
The Sandoub factory, located in Dakahlia Governorate, involved comprehensive integrated engineering design encompassing architectural, structural, mechanical, and electromechanical aspects.
factory capacity : | Design capacity of 1200 tons per day |
area covered : | Factory project covered a substantial 18 acres |
year : | The project was successfully implemented in the year 2019 AD. |
total cost : | Total Project Cost: 155 million Egyptian pounds |
project location: | Sandoub, Daqahlia, Egypt |